VSDATA

Armenia

Plan for high-density computing.

AI Factory is an infrastructure development direction within the project. It is not an operational GPU service.

Discuss your requirements
Conceptual engineering diagram. Not a facility model or operational service.

Start with the engineering envelope.

A development brief built around the interfaces your equipment needs.

Requirement groups
3

Electrical, thermal and network requirements.

Project directions
2

AI infrastructure development alongside colocation.

Website languages
2

Explore the brief in English or Armenian.

Make the next step specific.

A structured discussion separates your requirements from the evidence and decisions still needed.

  1. Define

    Document the equipment, interfaces, constraints and intended timing.

  2. Validate

    Review feasibility, evidence, dependencies and any unresolved assumptions.

  3. Agree

    Record the scope, responsibilities and next decision points. Commitments require confirmation.

Start with the engineering envelope.

Electrical requirements

Rack density, load profile, distribution, protection, and commissioning requirements.

Thermal requirements

Liquid or air cooling interfaces, water quality, heat rejection, and operating conditions.

Network requirements

Fabric topology, external connectivity needs, and management requirements.

From workload to infrastructure.

Start with the compute architecture and expected demand, then coordinate rack power, heat rejection and network design. A phased plan gives each design decision clear dependencies and acceptance criteria before equipment deployment.

The details that shape a useful brief.

Workload and density

Describe the intended compute architecture, rack power profile and growth assumptions. GPU type or server count alone does not define the infrastructure requirement.

Liquid-cooling readiness requirements

Review the equipment cooling interface, coolant specification, distribution boundaries, leak management and maintainability. No installed liquid-cooling capability is implied.

Commissioning before commitment

Develop acceptance criteria for electrical, thermal and network behavior. The roadmap must distinguish studies, design decisions, construction, testing and any future operational release.

Start with your requirements.

Tell us about your equipment and your infrastructure needs.

Discuss your requirements